Transportation Engineering Software Development

Design and Evaluation of Safety Barriers for the TRC Test Track

Limited Use Documents

Progress Reports and Attachments are furnished only for review by members of the TRC project panel and are regarded as fully privileged.  All files on this page are password protected.  If you need access to one of these documents email chuck@roadsafellc.com.

 

 

 

 

                                           

 

Quick Links

Quarterly Progress Reports

Chuck A. Plaxico, Ph.D.

RoadSafe LLC
P.O. Box 312

12 Main Street
Canton, Maine 04221
chuck@roadsafellc.com
Phone: +1-207-514-5474

 

 

 

 

 

 

 

 

 

November 2012 Monthly Report (October 2012)

· Attachment A: Invoice

· Attachment B: Meeting Report

· Attachment C: PowerPoint Summary with Preliminary Results

 

December 2012 Monthly Report (November 2012)

· Attachment A: Invoice

· Attachment B: Analysis Summary and Discussion Points for Teleconference

 

Interim Report

· Appendix A:  Guardrail Drawings

· Appendix B:  TRC Track Schematic

· Appendix C:  Track Superelevation Tables

· Appendix D:  CTL Engineering Soils and Asphalt Boring Report

 

January 2013 Monthly Report (December 2012)

· Attachment A: Invoice

 

March 2013 Monthly Report (February 2013)

· Attachment A: Invoice

 

April 2013 Monthly Report (March 2013)

· Attachment A: Invoice

 

Final Report (July 30, 2013)

· Appendix A: Drawings for Existing Guardrail

· Appendix B:  Analysis Summary Sheets for Existing Guardrail

· Appendix C:  Analysis Summary Sheets for Conceptual Retrofit Designs

· Appendix D:  Construction Drawings for Retrofit Guardrail

· Appendix E: Analysis Summary Sheets for Final Retrofit Design

· Appendix F: Construction Drawings for the TRC Modified Guardrail

· Appendix G: Construction Drawings for the Modified Trailing End-Terminal

· Appendix H: Construction Drawings for the Modified Buried-in-Backslope

· Appendix I: Construction Drawings for the Transition System